Project Name | Hubei Kongjing KTV Party Room | Project Introduction | Multiple screens realize scene linkage. |
---|---|---|---|
Project Date | 2022.05 | Equipment used | LS4*3、LS2*18 |
Project Location | Wuhan, Hubei Province | Project Requirements | 1. The screen of each room is displayed independently. 2. The screens in each room need to be linked together. 3. There are many heterogeneous screens on site, and some modules need to be offset. |
View all cases
-
Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Name:Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Date:2021.01
Project Location:Shijiazhuang, Hebei
Project Introduction:1.G612C × 40 2. Full screen 14080 × 256 3. T1 discount point-to-point loaded P4 module
-
Guangxi Baise Garden Expo
Project Name:Guangxi Baise Garden Expo
Project Date:2020.11
Project Location:Guangxi
Project Introduction:Three screens on the left, middle and right + floor tile screen, showing a complete picture on four sides
-
Miami bar in Peixian County
Project Name:Miami bar in Peixian County
Project Date:2020.12
Project Location:Xuzhou, Jiangsu
Project Introduction:One main screen, one DJ console, six auxiliary screens, thirty-six box screens and five vertical screens
-
Luohu Huarun Mixc City
Project Name:Luohu Huarun Mixc City
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:Indoor P2 project, ring screen
-
Guizhou Xishui Junpin international KTV tree screen
Project Name:Guizhou Xishui Junpin international KTV tree screen
Project Date:2021.06
Project Location:Zunyi City, Guizhou Province
Project Introduction:Indoor P4 soft module to assemble a tree screen
-
Stair screen of Pingdu Zhongjie square overpass
Project Name:Stair screen of Pingdu Zhongjie square overpass
Project Date:2021.06
Project Location:Pingdu City, Shandong Province
Project Introduction:Whole stair screen
-
Beijing banana ring KTV
Project Name:Beijing banana ring KTV
Project Date:2021.02
Project Location:Beijing
Project Introduction:This project includes transparent screen module, soft module, outdoor P3 module, 1.86 module, 2.5 module and other multi specification modules. Each compartment adopts the combination of main screen 1.86 module and auxiliary screen 2.5 module. Each compar
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Nanjing garden city happy blue sea cinema
Project Name:Nanjing garden city happy blue sea cinema
Project Date:2019.12
Project Location:Nanjing
Project Introduction:KS9000、S2、G612、F2