Project Name | Shenling ring, Foshan, Guangdong | Project Introduction | 1. Three trapezoidal modules; 2. Load with sv8p + g616c; 3. One box and one card |
---|---|---|---|
Project Date | 2022.04 | Equipment used | SV8Pro、G612C*22 |
Project Location | Foshan, Guangdong | Project Requirements | 1. Creative display ring screen; 2. 4K point to point. |
View all cases
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Hubei enshi Athena bar
Project Name:Hubei enshi Athena bar
Project Date:2020.01
Project Location:Enshi
Project Introduction:
-
Zhuhai sanxi kechuang town
Project Name:Zhuhai sanxi kechuang town
Project Date:2018.03
Project Location:Guangdong zhuhai
Project Introduction:This project is composed of P3 conventional screen and P4 floor tile screen, two pieces are spliced together to form an l-shaped screen
-
Shenzhen baoan creative museum
Project Name:Shenzhen baoan creative museum
Project Date:2020.01
Project Location:
Project Introduction:2304×1536,P4
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.11
Project Location:Tibet
Project Introduction:Front main screen top ring screen four perimeter strip screen spherical screen in the sky screen.
-
Liaoning Anshan Tavern
Project Name:Liaoning Anshan Tavern
Project Date:2021.07
Project Location:Anshan, Liaoning
Project Introduction:Anshan tavern is equipped with several special-shaped screens with different shapes.
-
A bar in Chengdu, Sichuan
Project Name:A bar in Chengdu, Sichuan
Project Date:2020.11
Project Location:Chengdu
Project Introduction:1 x screen, 3 column screens, 4 ceiling screens and 4 perimeter strip screens